Garden Apartment Fiber Build in Rochester

We delivered PON-ready fiber to 180 units across three buildings in Rochester, pairing provider-neutral distribution with clean telecom rooms for fast turn-up.

Rochester, NHMultifamily & MDU10 weeks, split indoor rough-in and spring outside-plant
180units passed fiber-ready on day one
0.05 dBaverage fusion splice loss
5 daysto full closeout with fiber maps

The challenge

Rochester planners approved 180 rental units across three garden-style buildings near the Cochecho River. Ownership wanted fiber to each unit on day one. Copper risers and coax would not meet streaming and work-from-home demand, plus the city wanted clean telecom rooms, not hallway splices. Soil borings showed granite ledge at 30 inches.

Existing risers held limited spare conduit, and ledge under the parking lots ruled out shallow trenching. Winter frost narrowed the outside-plant window, so the schedule had to split indoor rough-in from spring lateral work without delaying certificates of occupancy. Leasing was set for May, so the team phased work by building.

Our solution

We built a central telecom room with single-mode backbone to an intermediate distribution frame (IDF) in each building. Microduct runs to every unit for future drops. Crews placed 144-count OS2 to the site and set 1x32 splitters for a passive optical network (PON) design. They left labeled slack for providers to light XGS-PON later. We used horizontal directional drilling (HDD) under two lots to avoid cutting new pavement and frost heave. All penetrations were firestopped per NEC Article 770.

Project lead Beatriz Yates (BICSI RCDD) certified riser links with an optical loss test set (OLTS) at 1310/1550 nm. She checked distribution spans with an OTDR (optical time-domain reflectometer) for macrobends. Fusion splices averaged 0.05 dB against a 0.10 dB limit, and PON loss budgets held under 28 dB total. The developer received .sor files, test PDFs and fiber assignment maps within five business days. It also got Google Earth map file (KMZ) as-builts backed by a 2-year workmanship warranty.

This Rochester multifamily project pairs apartment telecom room design with unit-ready PON distribution for owners who lease on speed. It reflects our fiber for apartments and condos approach across Strafford County, with provider-neutral splitters and clean records. Share unit counts and site plans for a Rochester pricing walk. You receive a budgetary number, schedule window, and assumptions within one business day.

More projects

Similar recent work

BerlinElectric Utilities & Cooperatives22 weeks

Cooperative FTTH Backbone Expansion in Berlin

For a North Country electric cooperative near Berlin, we placed 68 miles of backbone and distribution to pass 1,142 homes. Average splice loss hit 0.05 dB, and the XGS-PON-ready plant accepted on first submission.

ConcordGovernment & Municipal Broadband20 weeks

Downtown Municipal Conduit Backbone in Concord

For Concord's broadband office, we designed and placed 22 miles of backbone and microduct through downtown and Penacook. The 288-count open-access plant passed testing and left Main Street brickwork intact.

PortsmouthData Centers10 weeks

Data Hall Fiber Certification in Portsmouth

Data center operator at Pease Tradeport added 1,728 strands of OS2 and OM4 with diverse entrances. It hit 0.22 dB max MPO loss and zero tenant downtime.

Launch a project

Get a Fixed Fiber Price

Send drawings or route Google Earth map file (KMZ). Get itemized price, schedule window and exclusions within one business day.

Expect a planning estimate within one business day.

24/7 dispatch and restoration(603) 555-1131Use (603) 555-1131 24/7 and get a reply when fiber goes dark. Crews based in Nashua, Manchester and Portsmouth lay temporary cable to get circuits up, then splice the permanent repair and test it again.