NH Contractor License #NH-889348 · Bonded & insuredAll 10 counties
Fiber Optics New Hampshire
Aerial view of a new fiber route — White Mountains and covered bridge in New Hampshire

About Fiber Optics New Hampshire

New Hampshire fiber optic contractor since 2005 with own crews

We install and certify winter-hardened outside-plant (OSP) and premises fiber for providers, co-ops, towns, campuses, hospitals and data centers. Every job includes measured acceptance and maps.

Our story

A New Hampshire Contractor Focused on Hard Ground

Founded 2005.

Ledge and ice set our method from day one. We opened in Nashua in 2005 as a fiber optic contractor in New Hampshire for ground that breaks standard builds. Founder Mike Harrington, a former lineman, teamed with Greta Mathis, RCDD (Registered Communications Distribution Designer), to design for frost and till. Crews placed outside plant (OSP) cable with deeper cover and heavier aerial loading for ice. Horizontal directional drilling (HDD) cut fractured rock where plows failed, and all-dielectric self-supporting (ADSS) cable spanned gaps without a messenger. Today 28 staff work in three crews led by Laurel Rhodes and Greta Mathis, RCDD.

Safety holds at EMR (Experience Modification Rate) 0.81 with zero lost-time injuries since 2021. Crews place 310+ miles yearly, including 2024 Portsmouth microtrench and 2023 42-mile Coos middle-mile toward Pittsburg. An 8.2-km single-mode (OS2) link totals 5.08 dB: 3.28 dB fiber, 0.60 dB splices and 1.20 dB connectors. You get .sor optical time-domain reflectometer (OTDR) files, PDF report, splice map and GIS (geographic information system) as-builts in KMZ/DWG/PDF within five days. Installed plant carries a 2-year workmanship warranty with winter callbacks under 2% since 2022. Send route Google Earth map file (KMZ) or address list to receive a budget number, schedule window and assumptions within one business day.

Our crews place aerial strand and ADSS cable, jet innerduct, drill till and granite, microtrench blocks and set frost-rated handholes. We splice 48- to 288-count OS2 with core-alignment splicers averaging 0.02 to 0.05 dB, under the 0.10 dB target. Certification uses Tier 1 optical loss test set (OLTS) for loss, length and polarity. It adds Tier 2 optical time-domain reflectometer (OTDR) traces where required. Single-mode follows Telecommunications Industry Association (TIA) 526-7-A at 1310/1550 nm, multimode OM4 follows TIA-526-14-C at 850/1300 nm per TIA-568.3-D. Reviewed by our RCDD, November 2026.

See recent New Hampshire projects and open crew positions.

2,400+fusion splices completed monthly
310+miles of outside-plant (OSP) fiber placed yearly
98%first-pass optical time-domain reflectometer (OTDR) acceptance rate
47-minaverage emergency dispatch in Merrimack Valley

Values

How foremen run each job daily

Build for Winter First

We size ice loading, set vaults below frost and seal closures to GR-771. That work cut winter trouble tickets to under 2% since 2022 across northern routes.

Respect the Town Road

We photo stone walls and culverts before digging and keep Class VI access open. Daily closures go to select boards, and shoulders stay graded and seeded.

Prove Quality Like Owners

Every link gets OLTS loss and OTDR trace. Splice maps and KMZ as-builts arrive in five days with 98% first-pass acceptance and 2,400+ splices completed monthly.

Show Up in Storms

Live dispatch answers around the clock. Merrimack Valley storm arrivals average 47 minutes, and crews stay until OTDR traces and light levels hold stable and verified.

Credentials

Crew qualifications

NH Contractor License #NH-889348 · Two-year workmanship warranty on placed and spliced cable · test reports provided at each handoff

BICSI RCDD

Four RCDD (Registered Communications Distribution Designer) staff and six designers lead layouts, loss budgets and TIA-568.3-D compliance for campus and data-hall builds.

FOA CFOT and CFOS

Eleven lead splicers hold FOA (Fiber Optic Association) CFOT (Certified Fiber Optic Technician). They also hold CFOS (Certified Fiber Optic Specialist) for splicing, OTDR and passive optical network (PON) testing.

OSHA 30 and Competent Person

Twenty-eight field staff hold OSHA (Occupational Safety and Health Administration) 30. They provide competent-person coverage for trenching, confined space and fall protection on every crew.

Corning and CommScope Systems

Nine technicians are Corning and CommScope certified for closures, hardened connectors, panels and warranty-eligible builds in offices and data halls.

NHDOT Qualified Work Zone

Twelve supervisors hold NHDOT (New Hampshire Department of Transportation) work-zone qualification for flagging, temporary control and highway right-of-way permits.

CDL and HDD Operator Certified

Eight operators hold CDL (Commercial Driver's License) and horizontal directional drilling (HDD) certification for rock tooling, vacuum work and utility potholing.

Client feedback

Cutover notes

They bored under ledge on two streets where others wanted to blast. Our school stayed open during the pull, and the OTDR packet passed on the first review. Cleanest handoff we have had.
Mark D.Director of Technology, Lakes Region School District
Ice took down three spans north of Concord. Their night crew had us re-spliced, re-hung with proper snowshoes, and retested before morning dispatch. Documentation was exact.
Sarah L.Outside Plant Manager, Regional ISP
Our mill conversion needed risers, a new main distribution frame (MDF), and a duct bank to the street with DES wetlands nearby. They permitted it, sequenced around other trades, and certified every strand.
James R.Facilities Director, Manchester Commercial Development

Supporting GCs, ECs & primes

Send Your Bid Package

Forward plans, specs and bid date. Obtain compliant unit pricing, schedule and safety packet before your deadline.

Certified payroll for Davis-BaconSAM.gov registeredNAICS 237130 · 238210Prequalified for ISNetworld & AvettaBuy America recordsBonded for public work

Begin your project

Get a Fixed Fiber Price

Send drawings or route Google Earth map file (KMZ). Get itemized price, schedule window and exclusions within one business day.

Expect a planning estimate within one business day.

24/7 dispatch and restoration(603) 555-1131Use (603) 555-1131 24/7 and get a reply when fiber goes dark. Crews based in Nashua, Manchester and Portsmouth lay temporary cable to get circuits up, then splice the permanent repair and test it again.