
Industries
Electric Cooperative & Utility Fiber Contractor in New Hampshire
Utility fiber construction, all-dielectric self-supporting (ADSS), optical ground wire (OPGW) support, underground, and supervisory control and data acquisition (SCADA) links for electric utilities and cooperatives built for ice, wind, and granite ground.
Overview
How we support Electric Utilities & Cooperatives
What keeps the grid talking? Separate hardened paths for protection, SCADA, and broadband that survive glaze, gale, and floods. Eversource and Liberty circuits climb ski ridges and lake peninsulas, while the cooperative serves 115 towns from the Seacoast to the Canadian border. The 2008 ice storm still guides design in New Hampshire. Design accounts for heavy taps, long outages, and glaze off Mount Washington plus spring floods on the Connecticut. We string ADSS on distribution, overlash transmission underlay, bore substation gets, and splice hardened rings from Keene to Berlin.
We work corridors on planned switching windows with cover-up, MAD clearances, and town flagging. HDD (horizontal directional drilling) bores feeders in HDPE with vaults above flood stage. Single-mode (OS2) tests at 1310/1550 nm per TIA-526-7-A to TIA-568.3-D, splices near 0.06 dB, pairs under 0.5 dB. Optical time-domain reflectometer (OTDR) traces map each bay. Doug Sims (FOA CFOS/T) closed them in four days with .sor and Google Earth map file (KMZ). Trucks roll from Concord off I-93 with 24/7 dispatch, in Laconia in two hours after a 14-mile ice rebuild. Call with circuit IDs and damage spot for patrol and a restoration window on that call.
Co-ops replacing copper pilot wire need communications that ride out ice and wind. We map substation priorities, easements, and pole loading before crews arrive, starting with utility-focused route studies and staking plans that state reviewers accept. Our teams perform armored cable placement in substations and rights-of-way and self-supporting and lashed spans on distribution poles with grounding and clearances checked. Compare options in buried versus overhead cable decisions for storm country to set budgets that survive January.
Challenges
Why these networks get complicated
Ice, wind, and snow loading
Rime on Washington, glaze in Merrimack Valley, and lake snow overload long spans. We correct ruling spans, add down guys, and set proper tension with dampers for icy exposed ridges.
Ledge, boulders, and protected corridors
Substation ducts hit granite within feet around Concord and the Upper Valley, while wetlands trigger state review. We bore rock, build engineered duct banks, and map routes that dodge blasting.
Scattered co-op membership
Woods roads serve a handful of meters plus seasonal camps on Winnipesaukee and Squam. We phase by substation zone, build backbone first, and leave documented logged coils for later laterals.
Outage coordination and safety
Joint work above driveways, schools, and Routes 4, 101, and 125 leaves no room for guesswork. We lock switching windows, MAD clearances, and flagging with utility dispatch and town road crews.
Our approach
How we resolve them
ADSS and OPGW deployment
We place all-dielectric self-supporting cable on distribution, manage grounding and vibration dampers, and splice in weather-sealed closures. OPGW replacement pulls get controlled utility tension and engineered dead-ends where specified only.
Substation and SCADA fiber networks
Diverse entries, control-house panels, and RTU and relay ties form rings for SCADA and protection. Paths are clearly labeled to bay and relay ID, tested, and mapped for control operators.
Hardened underground and make-ready
Make-ready teams survey poles, transfer attachments, and set replacements while boring crews place high-density polyethylene (HDPE) getaways. Vaults sit above flood lines and clear of state DOT plow routes for winter access.
Storm response and maintenance
After ice or gale, we patrol, re-hang, re-splice, and re-certify spans with photo logs and fresh proofs. Annual Prevention covers re-tensioning, slack dressing, and corridor hazard coordination with forestry crews.
Services
Services Electric Utilities & Cooperatives depend on
Proof
Electric Utilities & Cooperatives projects

Cooperative FTTH Backbone Expansion in Berlin
For a North Country electric cooperative near Berlin, we placed 68 miles of backbone and distribution to pass 1,142 homes. Average splice loss hit 0.05 dB, and the XGS-PON-ready plant accepted on first submission.
FAQ
Electric Utilities & Cooperatives FAQ
Addresses energized ADSS stringing, ledge winter pacing plus storm and SCADA records.
Can you string ADSS on energized distribution and transmission corridors?
Yes. Our crews build ADSS lashed and overlashed to Eversource, Liberty Utilities, and New Hampshire Electric Cooperative poles. They work under utility safety rules and coordinate outages and cover-up with the pole owners when clearances demand it. We handle sag, snow-and-ice loading calculations, down-guying, and bonding, then splice and OTDR-test each substation-to-substation section for SCADA, protection, and co-op broadband use.
How do you keep co-op broadband builds moving through ledge and winter?
We sequence co-op broadband builder work around New Hampshire realities. Probing finds granite ledge, switching from plow to rock-saw or directional boring in Merrimack Valley till and Lakes Region ledge. Scheduling covers town-road bores outside mud-season postings and frost laws. Winter splicing moves into heated trailers and substation huts, while aerial crews continue make-ready and lashing when bucket access is safe.
Do you provide storm restoration and SCADA documentation utilities can audit?
We staff 24/7 emergency response for downed ADSS, OPGW, and distribution fiber after nor’easters and ice events from Keene to Berlin, with storm ticketing, photo documentation, and OTDR proofs for each repaired span. For SCADA fiber networks we deliver loss budgets, splice maps, panel schedules, and as-builts tied to substation IDs. Engineering and compliance teams can trace every path without field revisits.

Start your project
Get a Fixed Fiber Price
Send drawings or route Google Earth map file (KMZ). Get itemized price, schedule window and exclusions within one business day.
Expect a planning estimate within one business day.