Regional hospital network
Hospital Campus Fiber Ring in Manchester
Regional hospital network in Manchester received a 12-mile diverse fiber ring linking three buildings across two Merrimack crossings. Failover verified under 50 ms with zero clinical downtime.
The challenge
The hospital fiber ring replacement had to remove a single Bridge Street river crossing. It carried EMR, PACS imaging and VoIP for three buildings. Mill-yard streets between Elm and McGregor offer no clean path, with Eversource duct banks, NHDOT corridors and century-old mill conduits packed. One backhoe strike or ice-jam flood on the Merrimack River floodplain would drop all three sites at once. Facilities faced a Joint Commission review requiring proof of diverse routing.
Surgery and emergency department intake had to stay online while crews worked around heating-plant steam tunnels and live utilities. Freeze-thaw heaves brick sidewalks and floods vaults along Notre Dame Avenue each winter, so below-grade plant needed raised, sealed protection. Infection-control rules barred dust and vibration near surgical suites, which ruled out daytime coring and blasting. The new plant had to provide HIPAA-ready separation with proof of physical diversity.
Our solution
We engineered a 12-mile counter-rotating ring with east and west Merrimack crossings to remove the single-point failure. Crews placed armored OS2 in new 4-inch high-density polyethylene (HDPE) under Second Street and Granite Street, bypassing packed mill ducts. An eight-person team used night horizontal directional drilling (HDD) and vacuum excavation to clear steam and Eversource lines. It worked after city, NHDOT and public utility commission (PUC) approvals. Ledge near Stark Park was hammered and sleeved, and vaults were raised with flood-rated closures.
Inside teams pulled riser fiber to each intermediate distribution frame (IDF) through sealed cores on separate power. Field supervisor Dawn Hartman (FOA CFOS/S) spliced in nursing-approved windows, averaging 0.04 dB with no splice over 0.09 dB. Each span passed Tier 1 insertion-loss with an optical loss test set (OLTS) per TIA-526-7-A plus Tier 2 OTDR (optical time-domain reflectometer) traces. We delivered .sor files, splice maps and Google Earth map file (KMZ) as-builts in five days. Send riser drawings for a priced scope and schedule within one business day.
Manchester hospital engineers wanted diverse paths that stayed live during construction. So we combined campus route and permit design with conduit and handhole placement across the West Side. It reflects our hospital and clinic network builds with armored cable and sealed closures. Facilities around central Manchester can send campus maps and closet lists for a budgetary number, schedule window, and assumptions within one business day.
More projects
Similar recent work

Downtown Municipal Conduit Backbone in Concord
For Concord's broadband office, we designed and placed 22 miles of backbone and microduct through downtown and Penacook. The 288-count open-access plant passed testing and left Main Street brickwork intact.

Signal Corridor Fiber Design in Laconia
We designed 8.5 miles of traffic-signal fiber in Laconia and spliced 48-count trunks under overnight closures. Our work gave public works a documented intelligent transportation systems (ITS) path.

Data Hall Fiber Certification in Portsmouth
Data center operator at Pease Tradeport added 1,728 strands of OS2 and OM4 with diverse entrances. It hit 0.22 dB max MPO loss and zero tenant downtime.

Launch a project
Get a Fixed Fiber Price
Send drawings or route Google Earth map file (KMZ). Get itemized price, schedule window and exclusions within one business day.
Expect a planning estimate within one business day.