Fiber Optics New Hampshire
Wireless tower with fiber backhaul cabling

Private university facilities group

Campus DAS Fiber Backhaul in Lebanon

For a private university group in Lebanon, we built OS2 backhaul to 12 DAS and small-cell nodes across the Upper Valley complex. Signal gaps closed in halls, garages, and labs with headroom for two more carriers.

Lebanon, NHEducation & Campuses14 weeks
12 nodesDAS and small-cell locations lit on OS2 backhaul
900fusion splices averaging 0.06 dB loss
4 networksmajor carriers plus private 5G on shared headend
0class or clinic outages during night and break-week work

The challenge

What the campus needed was DAS fiber coverage without opening historic walls across the Miracle Mile and riverside labs near the Connecticut River. Nineteenth-century brick, granite foundations, and protected elms block new wireless paths and trenching. Dense students, telehealth research, and crowded 5 GHz spectrum had overloaded legacy distributed antenna system (DAS) fed by aging OM2. Dead zones persisted in lecture halls, garages, and the simulation wing.

Why schedule and method matter is uptime and approvals. Shutdowns had to miss classes, grant-funded lab freezers, and hospital-affiliated clinics sharing backhaul. The City of Lebanon and state historic review limited rooftop and facade work. Winter icing on Mascoma River spans threatened aerial sections, while IT required three carriers plus private 5G without tearing historic plaster.

Our solution

We built a headend with 24-count OS2 home runs to twelve rooftop and garage nodes. A crew pulled armored cable through steam tunnels to avoid historic walls and tapped backbone on Mount Support and Heater Roads. Rooftop antennas sit on non-penetrating sleds cleared with city and historic review. Mascoma crossings use sealed closures and raised handholes for floods, with night-placed ice-rated slack.

Marcus Bell (FOA CFOT) finished 900 splices with MPO (multi-fiber push-on) breakouts at 0.06 dB under a 0.10 dB limit. Tier 1 tests with an optical loss test set (OLTS) per TIA-526-7-A passed each run. Tier 2 OTDR (optical time-domain reflectometer) traces cover 1310/1550 nm. Carrier PIM (passive intermodulation) sweeps are filed as .sor and PDF in three days. Staged off I-89 in West Lebanon with 24/7 dispatch inside an hour; send plans for pricing and window in one business day.

Upper Valley lecture halls had dead zones that Wi-Fi alone could not fix. So this Lebanon build paired small-cell and antenna fiber links with backbone and node splicing. It shows our university and school campus deployments with low-loss single-mode trunks. Planners in the Lebanon area can send building lists and floor plans. They can provide a budgetary number, schedule window and assumptions within one business day.

More projects

Similar recent work

LaconiaTransportation & ITS7 weeks, including overnight splicing windows

Signal Corridor Fiber Design in Laconia

We designed 8.5 miles of traffic-signal fiber in Laconia and spliced 48-count trunks under overnight closures. Our work gave public works a documented intelligent transportation systems (ITS) path.

North ConwayISPs & Telecom Carriers3 weeks

Ice Storm Emergency Restoration in North Conway

Regional ISP lost nine miles of aerial plant on Routes 16 and 302. We relit the core ring in 18 hours and rebuilt 600+ splices to heavy-ice spec in three weeks.

PortsmouthData Centers10 weeks

Data Hall Fiber Certification in Portsmouth

Data center operator at Pease Tradeport added 1,728 strands of OS2 and OM4 with diverse entrances. It hit 0.22 dB max MPO loss and zero tenant downtime.

Launch a project

Get a Fixed Fiber Price

Send drawings or route Google Earth map file (KMZ). Get itemized price, schedule window and exclusions within one business day.

Expect a planning estimate within one business day.

24/7 dispatch and restoration(603) 555-1131Use (603) 555-1131 24/7 and get a reply when fiber goes dark. Crews based in Nashua, Manchester and Portsmouth lay temporary cable to get circuits up, then splice the permanent repair and test it again.